Price | Negotiable |
MOQ | 1 set |
Delivery Time | 20-30 days |
Brand | CHBEST |
Place of Origin | China Hebei |
Certification | CE/BV/SGS |
Model Number | XY1100 |
Packaging Details | plastic film for naked machine |
Supply Ability | 20 sets/month |
Place of Origin | China Hebei | Machine speed | 8-12m/min |
Control system | PLC | Packaging Details | plastic film for naked machine |
Color | Blue or as your request | Model Number | XY1100 |
Supply Ability | 20 sets/month | Certification | CE/BV/SGS |
Brand Name | CHBEST | Delivery Time | 20-30 days |
Product name | Peru Pouplar Design Double Layer Roofing Sheet Cold Roll Forming Machine | Minimum Order Quantity | 1 set |
Cutting type | Hydraulic | Driven system | Chain or gear box |
Peru
Pouplar
Design
Double
Layer
Roofing
Sheet
Cold
Roll
Forming
Machine
㈠. Profile drawing:
As customer request
㈡. Working flow:
Decoiler---------feeding--------roll forming--------cut to length-----output table
㈢. Machine components:
De-coiler------------------------------------------1set
Forming machine--------------------------------1set
Cutting device-----------------------------------1set
PLC control box ---------------------------------1set
Hydraulic pump station-------------------------1set
Output table---------------------------------------1set
Technical Parameter
Part details |
Item Name |
Specification |
Manual uncoiler |
carrying capacity |
5-8 tons |
Stype |
Manual |
|
Raw coil |
Coil material |
steel |
Coil thickness |
0.3-0.8 mm |
|
Machine body |
Roller station |
15 station |
Roller material |
45# steel |
|
Shaft material |
45# steel |
|
Shaft diameter |
75 mm |
|
Machine weight |
About 6.5 tons |
|
Machine size |
5-7.5*1.3*1.3 m |
|
Speed |
8-12 m/min |
|
Cutter |
Operate |
Hydraulic cutting |
Blade material |
Cr12 |
|
Power |
Operate |
Chain transmission |
Chain size |
1 inch chain |
|
Control system |
PLC brand |
Taiwan delta |
Motor power |
7.5 kw |
|
Hydraulic pump power |
3 kw |
|
Voltage |
380V 50Hz 3phase |
|
Machine color |
As ur need |
|
Machine language |
Chinese
and
English |
Payment
type:
30%
T/T
prepaid
and70%
balance
should
be
paid
before
loading
Delivery
time:
30
days
after
receiving
advance
payment.
Guarantee
period:
12months
free
service/
pay
service
all
the
machine
life
Installation
and
training:
①
If
buyers
visit
our
factory
and
check
the
machine,
we
will
teach
you
how
to
install
and
use
the
machine,
and
also
train
your
workers/technician
face
to
face.
②
Without
visiting,we
will
send
you
user
manual
and
CD
to
teach
you
to
install
and
operate.
③
If
buyer
needs
our
technician
to
go
to
your
local
factory,please
arrange
board
and
lodging
and
other
necessary
things.
Packaging :
1. Tighten to container with steel wire rope and welded machine with container by angel iron
2. Main forming machine and un-coiler is naked(If you need we can also packed with water-proof plastic)
3. PLC contral system and motor pump are packed in wooden box with water proof paper coverage
Installation and training:
1.If
buyers
visit
our
factory
and
check
the
machine,
we
will
teach
you
how
to
install
and
use
the
machine,
and
also
train
your
workers/technician
face
to
face.
2.Without
visiting,
we
will
send
you
user
manual
and
video
to
teach
you
to
install
and
operate.