Price | Negotiable |
MOQ | 1 set |
Delivery Time | 40 days after received the down payemnt |
Brand | JEFFER |
Place of Origin | Chongqing, China |
Certification | ISO9001, ISO14001, ISO45001 |
Model Number | JEFFER-C-2022-4 |
Packaging Details | Wooden case, tray, steel frame, etc |
Payment Terms | T/T, L/C |
Supply Ability | 10 set per 1 months |
Wiegand signal | Output and input | Usage | Industry field |
Place of Origin | Chongqing, China | Warranty | One year |
Support | DCS, PLC | Packaging Details | Wooden case, tray, steel frame, etc |
Material | Mild Steel | Model Number | JEFFER-C-2022-4 |
Supply Ability | 10 set per 1 months | Certification | ISO9001, ISO14001, ISO45001 |
Brand Name | JEFFER | Payment Terms | T/T, L/C |
Type | Automatic control PLC | Price | Negotiable |
Delivery Time | 40 days after received the down payemnt | Product name | Temperature control system |
Minimum Order Quantity | 1 set | After-salses service | Video technical support, Field maintenance |
Power | 15Kw | Display | PLC |
15Kw
Automatic
Control
Furnace
Control
System
Digital
Monitoring
for
Furnace
Temperature
1.
Brief
Description
A
set
of
advanced
and
reliable
computer
automatic
control
system
will
be
adopted
for
furnace
control.
The
three
operation
modes
(fully
automatic,
semi-automatic
and
manual)
can
be
switched
freely
to
avoid
any
failure
of
the
automatic
system.
2.
Types
of
automatic
control
Item | Description | Specification |
1 | DCS | Centralized management, decentralized control, with design ideas of "overview to details" |
2 | PLC | Independent Section control by SCADA (Supervisory Control And Data Acquisition) control network system, i.e. dat acquisition and supervisory control system |
Item | Description |
1 | High reliability |
2 | Simple programming, easy operating |
3 | Flexible combination, convenience usage |
4 | Strong functionality |
5 | Short development period |
6 | Small volume, low power comsumption |
Item | Description |
1 | More modulating control |
2 | More functional operation |
3 | Better control effect on controller, I/O plate, communication network |
4 | Centralized management |
5 | Decentralized control |
6 | Independent workshop section control |
Item | Description |
1 | Real time data acquisition during production |
2 | Process monitoring of production equipment |
3 | Abnormity alarming of production equipment |
4 | Data acquisition and report |
5 |
Instrument
panel
display |
3.
Packing
and
Shipping
JEFFER has rich experiences on experiences of products packing , loading and delivery via various transportations.
|
|
|
|
7. FAQ
Q:
Who
we
are?
A:
JEFFER
Engineering
and
Technology
Co.,
Ltd
is
a
professional
engineering
company
specialising
in
project
design,
engineering
technology
consulting,
engineering,
procurement,
construction
(EPC),
and
project
operation
management.
Q:
Can
you
customize
the
products?
A:
Yes,
we
have
an
experienced
professional
team
ready
to
make
design
according
to
the
requirement
of
customers.
Q:
Do
you
offer
installation
on
site
overseas?
A:Yes,
we
can
provide
our
engineer
to
supervise
the
installation
work
on
site
or
provide
the
the
whole
installation
team
on
site
to
finish
the
project.
Q:
Confidential
protection
provide?
A:
Strict
drawing
management
system
eliminates
the
risk
of
the
leakage
and
protects
your
interests.